Well its been a while but the corner tunnel was too tight also too tight it was ballasted and finished but had to come out and be re done!
That was April, then the summer break and here we are all to quickly from a none summer point of view back to nights drawing in and some modelling.
Rob Gunstone and a few other contributors to this thread advised get some trains running first don’t concentrate on finishing areas! As seen on previous pages that’s what I‘m going for.
Re-doing the tunnel.



That was it tested and ok and left until the last few weeks when I‘ve snatched a few evenings.
Then I got the opposite side of the viaduct laid and connected temporary and at last a train running!
Not faultless but I’m happy.
Now consideration as to what next probably complete the track and a bit of scenery along the way.
The Quay board side of the viaduct I’m thinking is none to clever.
As the viaduct is based on The Curved Iron one in Barnstaple a building as per those on the bank there call to me but that wouldn’t fit and make a transition to the quay.
What is currently there is based on Great Torrington out the tunnel and across the viaduct.
Any ideas greatly recieved!
Until next time.
Cheers.