Hadleigh's Ltd. Sevastopol Works

Dave

Western Thunderer
I forgot to say that I got the traverser locking done. No picture because it looks pretty much the same as it did but with some tubes soldered on and a bent length of brass rod.

To store wagons at the sector plate end I made a shelving thingy to store them in.
20260405_130813.jpg
On the baseboard face I have added pockets to hold the wagon cards. I have since added the siding location/names to these.
The pocket on the left holds the pack of cards, from which are drawn 7 to make up the train. The train is run out to the weighbridge loop, where the cards are held in an ARRIVALS pocket. As each wagon is moved to its destination, its card is removed from ARRIVALS and deposited in the location pocket e.g. Boiler House.

What I haven't yet worked out is when and which wagons should be gathered in and have their cards put into the DEPARTURES pocket to make up a train go back to BR. Or when to run an internal only train. Dice?
 

Dave

Western Thunderer
The very last area of bare baseboard has now been covered. I am in the process of making a chain link fence around the area.

20260418_175218.jpg


20260425_182532.jpg
The rails aren't connected to anything, nor are they live. If I had thought about it before ballasting I could have wired them up as the program track for the DCC system.
 
Top